6、消隱的防汛墻 Blanking of the flood prevention wall

防汛墻結合地形變化按城市防洪要求將基地設置為四個層次,除了20年、100年、千年一遇外另外加設濱水臺地,按統一的設計方式進行梯地跌落,對臺地進行藝術化的處理消除垂直駁岸,在保證人流的安全的前提下應讓人觀賞和感受到黃浦江是一條一日兩變的潮汐河。
6. In conformity to the flood control standards, the flooding walls are built with different dimensions, depending the time they are supposed to stand against floods – 20 years, 100 years or 1000years. In according to the design, at the top of the floodwalls will be constructed a waterfront platform. The four levels terrace ensures visitor to admire the tidal changes of the Huangpu River twice a day, without any worries about their safety.
點擊查看更多世博新聞
專題:2010年上海世博會